Work Begins at Lindenwood Rd. Range
Over the past couple of weeks a significant volume of dirt has been moved at the old quarry. The first week involved a 5-3/4 yard wheeled end loader moving piles and opening up the entrance road. The second week we had a large dozer leveling things out and began building berms.